Dow

Steam Header Compliance Project

Project Highlights

Scroll for more

Related Projects

ExxonMobil - Baytown Chemical Expansion Project (BCEP)
Oil, Gas & Chemical
Chemical

ExxonMobil

arrow_outward
Baytown Chemical Expansion Project (BCEP)
Motiva – H-Block Mechanical Project
Oil, Gas & Chemical
Refining
Combined Cycle

Motiva

arrow_outward
H-Block Mechanical Project
MHI/Exxon – North American Growth (NAG) Project
Oil, Gas & Chemical
Petrochemical

MHI/Exxon

arrow_outward
North American Growth (NAG) Project

When it matters most, we’re ready.

info@performance-contractors.com
(225) 751-4156

Dow - Steam Header Compliance Project

Scope/Services

Civil

Electrical & Instrumentation

Equipment Assembly & Erection

Millwright Alignment Work

Pipe Installation

Rigging & Heavy Lifts

Structural Steel Erection

Industry

Oil, Gas & Chemical

Chemical

Capability

Capital Construction

The Challenge

After a competitive RFQ process, Performance Contractors was selected for the Steam Header Compliance project at Dow, St. Charles. The project had two parallel (Legacy & Post Legacy) for the 600#, 200#, and 75# steam systems. The purpose of this project was to provide cross-ties between the header systems to allow isolation and repairs of existing steam leaks.

What We Did Differently

Each of the system cross-ties into the steam headers required an outage to complete the work. That meant there were three planned outages, each consisting of only one week to make more than 70 large bore tie-in welds. Normally, the general contractor works more closely with the engineering or construction team. Because of the type of work being performed and the number of process shutdowns required during a capital project, Performance had to work closely with the Dow Operations team. This challenging and unique project was successful due to the tremendous collaboration efforts between these two groups as well as their adaptiveness when problems arose.

Project Total Quantities

  • Steel Install { 100 Tons
  • Pipe Install { 7,570 LF
  • Equipment Set { 6 Pieces
  • Weld { 608
  • Weld Reject Rate { 0.0%

‍