Equipment Assembly & Erection
Hydrotesting
Millwright Alignment Work
Pipe Fabrication
Pipe Installation
Rigging & Heavy Lifts
Structural Steel Erection
Power
Combined Cycle
Capital Construction
Pipe & Steel Fabrication
The Kemper County Integrated Gasification Combined Cycle Project was designed to run Lignite Coal through a Gasification Process creating a Pressurized Gas or Syngas that could then power the Combined Cycle within the facility to produce electricity.
What We Did Differently
This new technology was also designed to be a Zero Discharge facility thereby capturing the various chemicals for utilization or commercial purposes. Our scope included 823,743 linear feet of pipe, 2,451 pieces of process equipment, and 15MM manhours.