ExxonMobil

Beaumont Light Atmospheric Distillation Expansion (BLADE)

Project Highlights

Scroll for more

Related Projects

Chevron - Refinery Light Tight Oil (LTO) Project
Oil, Gas & Chemical
Refining

Chevron

arrow_outward
Refinery Light Tight Oil (LTO) Project
IHI – Elba Liquefaction Project
Oil, Gas & Chemical
Liquified Natural Gas (LNG)

IHI

arrow_outward
Elba Liquefaction Project
Air Products - HyCO4 Project
Oil, Gas & Chemical
Industrial Gases

Air Products

arrow_outward
HyCO4 Project

When it matters most, we’re ready.

info@performance-contractors.com
(225) 751-4156

ExxonMobil - Beaumont Light Atmospheric Distillation Expansion (BLADE)

Performance Contractors served as general contractor for ExxonMobil’s Beaumont Light Atmospheric Distillation Expansion, supporting construction of a new Prefractionator and Atmospheric Pipestill unit capable of processing 250,000 barrels of light crude per day. The 3.5-million-man-hour project included 1,850 tons of structural steel, 34 modules, 88 pieces of equipment, and 69,000 linear feet of piping, with Performance self-performing 51% of the work. Safety was embedded throughout project execution—contributing to a 0.11 TRIR and recognition from ExxonMobil with back-to-back Global Project Presidential Safety Awards in 2019 and 2020.

Scope/Services

Boiler & Furnace Erection & Repairs

Civil

Equipment Assembly & Erection

Front End Services

Hydrotesting

Millwright Alignment Work

Module Assembly

Module Installation

Pipe Installation

Rigging & Heavy Lifts

Structural Steel Erection

Industry

Oil, Gas & Chemical

Refining

Location

Beaumont, TX

Project Total Quantities

  • Manhours { 3.5MM
  • Structural Steel { 1,850 T
  • Modules Set { 34 ea
  • Equipment Set { 88 ea
  • Piping { 69,000 LF
  • Tower Dress Out & Installation { 11
Item
Quantity
This is some text inside of a div block.
This is some text inside of a div block.