Bayer

Luling Expansion Project

Project Highlights

Scroll for more

Related Projects

ExxonMobil - Baytown Chemical Expansion Project (BCEP)
Oil, Gas & Chemical
Chemical

ExxonMobil

arrow_outward
Baytown Chemical Expansion Project (BCEP)
Motiva – H-Block Mechanical Project
Oil, Gas & Chemical
Refining
Combined Cycle

Motiva

arrow_outward
H-Block Mechanical Project
MHI/Exxon – North American Growth (NAG) Project
Oil, Gas & Chemical
Petrochemical

MHI/Exxon

arrow_outward
North American Growth (NAG) Project

When it matters most, we’re ready.

info@performance-contractors.com
(225) 751-4156

Bayer – Luling Expansion Project

Scope/Services

Boiler & Furnace Erection & Repairs

Civil

Equipment Assembly & Erection

Front End Services

High Alloy Welding

Hydrotesting

Millwright Alignment Work

Pipe Detailing

Pipe Fabrication

Pipe Installation

Rigging & Heavy Lifts

Structural Steel Erection

Industry

Oil, Gas & Chemical

Chemical

Capability

Capital Construction

Pipe & Steel Fabrication

The Challenge

The Bayer Luling Expansion Project consisted of a congested 180’ tall ISBL structure with elevated concrete decks every 30’ along with pipe racks running to adjacent facilities. The total project included 100,000 square feet of elevated concrete decks, 7,300 tons of structural steel, 250,000 linear feet of pipe, with a significant amount of the pipe being high alloy, and over 475 pieces of equipment.

Project Total Quantities

  • Elevated Concrete Decks { 100,000 Sq. Ft.
  • Structural Steel { 7,300 Tons
  • Pipe { 250,000 Linear Ft.
  • Equipment { 475 Pieces